Sunday, August 2, 2015

Progress

Sorted some bit's and pieces out for shot blasting and powder coating 


 The tank was always going to be a bit iffy - there are a couple of holes that I've had tig welded and some lead solder work done. This is going to be followed up with a tank liner.


 Wheels,  stands,  brake arm, battery box and a few odds and ends back - looking bloody good I think.
 Next Batch to go down with the frame.
 Like a butterfly from a caterpillar - albeit a lumpy butterfly but hey this was never about making her look like new - more like clean, old and used!


 Needed to clear out my workshop and sort my tool bench out. Thought it would be a good time to pull everything out and see what I've got, what I need and what I need to do next.




Sunday, July 12, 2015

XS850 Strip Down day 2




























Definitely a story of stripped - sheared and shagged bolts - all day just to get to this stage - not sure if the project is going to be viable to be honest - so many bolts shearing and we have one exhaust header clamp bolt sheared off in the head, Centre plug needing helicoiling, and front left engine mount bolt sheared off. FUN FUN FUN!

Engine is now loose in the frame and all components are bagged and labelled. Just need to get the lowdown on engine removal now.